Menu

2-in-1: Highly flexible mould system

Perspective through the interior corridor of a high battery vertical formwork Blue vibrating table with orange vibration motor and 12 Finished prestressed concrete double-T beams with protruding reinforcement stirrups stacked Long steel formworks with blue side frames and tension cables in precast plant

The Swiss Müller-Steinag Group is investing in the further development of its Schachen plant: The goal is to fulfil not only the role of a supplier with the plant established in 1981, but also that of a partner with holistic building concepts. For this purpose the company expanded its own engineering department and the machine pool was extended and diversified. Together with Tecnocom, a Progress Group company, a highly flexible mould system for the manufacture of TT slabs and rod-shaped precast concrete elements was developed and installed. Production started in November 2016.

Download press article (pdf)

Tecnocom convinced us with their technical solutions.

Thomas Wyss, Managing Director of the Schachen plant, Müller-Steinag Element AG